All sites will be receiving new Synchrony POP this week for display on October 1. Our Q3/Q4 national campaign POP will still be required to be displayed. Sites should swap 50% of their POP to put up the new Synchrony POP; displaying both our Q3/Q4 mobile pay national campaign and the Synchrony Q4 Campaign. Please review placement guides on Phillips 66 Gateway for more information.

Phillips 66® Pump Topper

Conoco® Pump Topper

76® Pump Topper